Quotes
How to read a dumpster quote
A “starting at” number is often not the final bill. The difference usually comes from weight, time, and items the company will not take. Ask every company the same questions before you book.
What to look for in writing
- Base rental. The advertised or quoted price for a stated dumpster size and a stated number of days.
- Included weight (tonnage). How many tons or pounds are in the base price. A 20-yard box that is “full” of dirt or tile can weigh much more than the same box of household junk.
- Overage. The charge per extra ton (or pound) if you go over the included weight.
- Extra days. The daily fee if you keep the dumpster past the included rental period.
- Delivery, pickup, fuel, and taxes. Whether they are in the base price or added later.
- Prohibited items. Paint, tires, appliances, batteries, asbestos, and other hazardous materials are commonly banned. Putting them in the box can trigger a separate fee or a rejected load.
- Placement. Driveway versus the street. If the dumpster will sit in the public right-of-way, you may also need a city or parish permit. See the metro permit guide.
People asking for recommendations in local forums often mention surprise weight charges and quote forms that lead to repeated sales calls. Getting the included tons, overage rate, and rental days in writing is the straightforward way to compare two quotes that look similar at first glance.
Worked example — hypothetical, not a real quote
The figures below are an illustration of the math. They are not a quote from any company in the Dumpster Prices NOLA directory, and they are not average prices for the New Orleans metro.
Suppose a company quotes $400 for a 20-yard dumpster for 7 days, and the quote says that price includes 2 tons, with overage at $80 per extra ton and extra days at $30 per day.
Actual weight: 3 tons → 1 extra ton × $80 = $80
You keep it 2 extra days → 2 × $30 = $60
Total in this example: $400 + $80 + $60 = $540
The “$400 quote” and the final bill differ because of weight and time, not because a new line item appeared out of nowhere. If a second company quotes $475 with 3 tons included and 10 days, that second quote could be cheaper for this same job — or more expensive, if its overage or extra-day rate is higher. Compare the full terms, not only the headline number.
Questions worth asking every company
- What size do you recommend for this debris, and what is included in the price?
- How many tons are included, and what is the overage rate?
- How many days are included, and what is the extra-day rate?
- Are delivery, pickup, disposal, fuel, and tax included?
- What items are prohibited, and what happens if one is found in the load?
- Will you place the dumpster on a private driveway, or does this location need a street permit?
Browse local companies in the metro directory. Dumpster Prices NOLA does not take bookings or collect quotes for you.
Putting the dumpster in the street? Check the dumpster permit helper first, since a city permit fee can add to your total.